Prefabricated wooden-based façade systems to save energy
- Installation of the 1st PMF panel
- Spanish demo after the renovation
- Transport of the PMF panels
The “La Vall 9” building in Bellpuig, Spain, was renovated with cutting-edge technology for deep energy renovation
The residential four-story building is part of the EU-funded project 4RinEU. The renovation took place between 2020 and 2021 and involved the use of prefabricated multifunctional timber façade modules to improve the insulation and cut the primary energy demand of the building by 60%.